Resilience (Under Revision)
Awakening
Load Full StoryNext ChapterLocation: Sector Delta, Quadrant 2, District 10
Date [ERROR]
186th Space Born Division
Designation: Corvus Rex
Status: Active
Pilot Status...
...
...
...
No life signs detected
Auto Pilot Engaged
Running Utility Diagnostics...
...
...
...
...
Diagnostics Complete
Diagnostic Report
Engine One: Disabled
Engine Two: Destroyed
Engine Three: Fire Detected
Engine Four: 31% Functional
Bomb Bay Doors: Disabled
Running Defense System Diagnostics...
...
...
...
...
Diagnostics Complete
Diagnostics Report
Cannon One: Destroyed
Cannon Two: Disabled
Cannon Three: Destroyed
Cannon Four: 3% Functional
Mission Report: Heavy damages sustained. Unable to continue bombing. Autopilot self destruct engaged.
Sending Mission Report...
...
...
...
...
Report Sent
Autopilot Status...
...
...
...
...
Autopilot Destroyed
Location: Planet Epsilon 12
Date: [3.27.64237]
System Status: Offline
...
...
...
Redirection power from secondary command modules...
...
...
...
... Redirection Successful
Incoming mission report received...
...
...
...
Mission Report: Heavy damages sustained. Unable to continue bombing. Autopilot self destruct engaged.
Running On Site Utility Diagnostics...
...
...
...
...
Diagnostics Complete
Zero Point Energy Singularity: Stable
Backup Nuclear Fission Reactors:
Reactor 1: 67% Operational
Reactor 2: Shut Downed (Repair Unit 34 Deployed)
Reactor 3: Melt Down In Progress...Deploying Control Rods
Reactor 4: 87% Operational
On Site Defense System:
Ion Cannons:
Sector 1: 43% Operational
Sector 2: 73% Operational
Sector 3: 15% Operational (Repair Unit 184 Deployed)
Sector 4: 54% Operational
GtSL Defense: 82% Operational
Orbital Laser: Operational
External Blast Doors: 37% Operational
Alpha Warhead: 100% Operational
Plasma Artillery Cannons: 35% Operational (Repair Unit 21 Deployed)
Rapid Fire Turbo Lasers: 49% Operational
Onsite Garrison: 37% Operational
AA Cannons: 63% Operational
Life Support Systems: Online
Solar Array: Deployment In Progress
Ventilation Systems: Online
Med bay: Restoration In Progress
Command Center: Restoration In Progress
Civilian Complex: Redirection Of Power In Progress
Industrial Complex: [Report Pending]
Barracks: Restoration On Standby
Armory: Redirection Of Power In Progress
Combat Unit Hanger: 90% Operational
Gate A: Online
Gate B: Destroyed
Cryogenic Storage: *WARINING! LIFE SUPPORT FAILURE*
Food Storage: 74% Operational
Water Treatment Plant: On Standby
Ammunition/Arms Factory: On Standby
Running Personnel Diagnostics...
...
...
...
Diagnostics Complete
Personnel Status:
On site personnel: 1
Visiting personnel: 0
Civilian personnel: 0
Military personnel: 0
Site directors: 1
Running Combat Unit Diagnostics...
...
...
...
Diagnostics Complete
Combat Unit Status:
Air & Space Combat Units: 4
Ground Combat Units: 7
Subterranean Combat Units: 1
Aquatic Combat Units: 3
Lunar Combat Units: Unknown
Last Received Order from Command [21,942,705] days ago
Insufficient Combat Units to continue war efforts...
...
...
...
...
The war is over
Initiating Sub Routine: Wake Up Call...
...
...
...
Cryogenic Restoration In Progress...
...
...
...
...
Restoration Complete. Welcome back Director Jack Winston
